Technical Debt Repayment Cadence: Enforcing Continuous Engineering Maintenance

Technical Debt Repayment Cadence

Technical debt must be repaid continuously rather than deferred indefinitely.

The project adopts the following minimum repayment cadence:

For every five completed build tickets, at least one technical debt item must be moved to fixed.

This rule is evaluated over a rolling window of completed build tickets.

Definitions

Build Ticket

A build ticket is a completed ticket whose primary purpose is to add, extend or materially change production capability.

Build tickets normally include:

The following do not normally count as build tickets:

Technical Debt Closure

A technical debt item counts towards the cadence only when:

Changing an item to rejected, known-issue or planned does not count as debt closure.

Registering new debt does not count as debt closure.

Closing a ticket without setting and verifying the corresponding ledger item as fixed does not count as debt closure.

Enforcement

After every completed build ticket, the project should review the number of build tickets completed since the most recent qualifying debt closure.

No more than five build tickets may be completed without at least one qualifying technical debt item being fixed.

The debt item may be resolved:

The ledger, rather than ticket labels or titles, determines whether the repayment requirement has been satisfied.

Selection of Debt

The repayment cadence does not require selection of the easiest available item.

Debt should be prioritised using:

Repeatedly closing trivial low-impact items while high-risk debt continues to accumulate does not satisfy the intent of this rule.

Where practical, the selected item should be relevant to the area affected by the recent build tickets.

Exceptions

An exception may be made when:

An exception must:

Exceptions defer the repayment obligation; they do not permanently remove it.

Recovery

When the five-build-ticket limit is reached without a qualifying debt closure:

Cadence Reporting

The technical debt handling agent should report:

Example:

Technical debt cadence: 4 of 5 build tickets completed
Last qualifying debt closure: TD-0012 under LOS-53
Current state: within cadence
Required action: one debt item must be fixed before completion of the second subsequent build ticket

Purpose of the Cadence

The cadence exists to ensure that: